Durham College celebrated the opening of the new Centre for Collaborative Education (CFCE) in October 2018. A legacy project tied to the college’s 50th anniversary in 2017, the CFCE has replaced the college’s aging Simcoe building, which was originally built as a temporary structure and opened in 1969.
The new multi-level, 75,000-square-foot-facility prioritizes the student experience in all aspects of its design and function. Along with abundant collaborative learning and social spaces, it holds industry-grade, cutting-edge labs, entrepreneurial and maker spaces, and inclusive learning environments. DC launched the Building Something Amazing capital campaign in September 2017 to raise $5 million towards the CFCE’s total build cost of $40 million.
Milestones
APRIL
2016
Durham College receives $22 million in funding from provincial government for new CFCE
MAY
2016
Building concepts finalized
SEPT
2016
Durham College receives $13 million in federal funding for new CFCE
NOV
2016
Durham College breaks ground for its new CFCE
DEC
2016
Site preparation/excavation
DEC
2016
Excavation of elevator shaft and foundation
JAN
2017
Footing installation (concrete/rebar work)
JAN
2017
Foundation wall installation
APRIL
2017
Progressive completion of the two end cores
MAY
2017
Installation of the structural steel floors one through four
JUNE
2017
Installation of metal decks (floor structure) on each level
SEPT
2017
Building being enclosed (On-going)
SEPT
2017
Installation of Internal Walls and Structures
SEPT
2017
Durham College publicly launches Building Something Amazing capital campaign
JAN
2018
Installation of HVAC, Electrical, Plumbing, Drywall and other interior fixtures
JUNE 2018
Simcoe building tenants relocated
SUMMER
2018
Simcoe building structure demolition – View time-lapse video
SUMMER
2018
Furnishings and outfittings installed
SUMMER
2018
Signage installed
SEPT
5
CFCE open to students